2.18 SANITARY ARRANGEMENT AND DRAINAGE:<br />

All asbestos cement and cast iron pipes are measured in running metres which includes all<br />

bends, tees, junctions, shoes etc.<br />

ware pipes.<br />

Drainage pipes are also to be measured as above and includes R.C.C. Hume Pipes and stone-<br />

Inspection chambers are by count (in number) upto a depth of one metre measured from top of<br />

cover to invert level. Extra depth is paid for under a separate item.<br />

2.19 RECORD OF MEASUREMENTS AND CHECKING OF BILLS:<br />

2.19.1 In respect of all the works listed from 2-6 to 2-18 above the Spot Auditor and his staff<br />

are responsible for checking the correctness of all measurements taken as per correct mode of<br />

measurements.<br />

All measurements checked are recorded by the Junior Engineer in duplicate in the<br />

measurement book kept at site where the work is in progress. The Spot Auditor and his staff ensure<br />

that the measurements are in accordance with the general conditions of contract and specifications.<br />

2.19.2.1 The original measurement sheets are to accompany the certificate voucher sent to the<br />

ASST. GENERAL MANAGER (AUDIT) for checking. On the basis of this certificate<br />

voucher, after check by Audit, a payment voucher is made. At the time of recommending<br />