15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

796<br />

In terms of SR 30/1, officers desiring personal work to be carried out<br />

in the <strong>Undertaking</strong>’s workshops requisition for it in the usual manner.<br />

The approving authority may withhold approval if the execution of<br />

private work is incompatiable with the interests of the <strong>Undertaking</strong>’s<br />

business. Full cost of labour and material with overheads at 25% on<br />

both is billed. The Transportation Engineering Department initiates<br />

OB Memo for recovering cost from officers for which the work was<br />

carried out.<br />

The Job Cost Sheets attached to a memo are checked for their<br />

arithmetical accuracy and rates of material used are verified from the<br />

Transaction Register of the M.M. Department.<br />

These Memos are also initiated in the case of charges to be billed to<br />

Officers for using <strong>Undertaking</strong>’s vehicles. As provided under SR 13/6,<br />

in connection with the business of the <strong>Undertaking</strong>, an officer in<br />

respect of Conveyance Allowance may have the use of a vehicle<br />

belonging to the <strong>Undertaking</strong> when his own car is out of order or not<br />

readily available subject to the prior sanction of the G.M. in each case.<br />

The officer concerned is charged for the use of the vehicle with or<br />

without driver as the case may be at rates sanctioned by the<br />

Committee from time to time.<br />

6.8.9.4 B.G. OB Memo<br />

These Memos are prepared and initiated by the Transportation<br />

Engineering Department for billing charges to be recovered from<br />

outside parties as under.<br />

1) From Municipal Corporation of Greater Mumbai:<br />

For works and repairs carried out to their vehicles in our workshop.<br />

Labour rates are checked from schedule charges with 135% overheads<br />

and material on actuals with 10% overhead + 10% price variation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!