15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1729<br />

nature with sketches, drafting special specifications and<br />

conditions of contract including designing layout of<br />

electrification.<br />

57) To prepare rate analysis for extra items and excess/saving<br />

statement, check and control the expenditure to keep it within<br />

sanctioned amount.<br />

- 3 -<br />

58) To maintain site records such as materials site account book,<br />

daily progress and inspection report, daily labour report.<br />

59) To supervise annual contract such as cleaning of electrical<br />

fittings, etc.<br />

60) To take initiative and frame concrete proposal to invite tenders<br />

regarding special Repairs & Maintenance works provided in<br />

Budget Estimates.<br />

61) To obtain quotations for small and urgent works and put up<br />

recommendations, after scrutiny, for award of contract.<br />

62) To ensure proper certification after scrutiny of contract work,<br />

payment of contractors' bills, refund of security deposit,<br />

performance guarantee, retention money, etc.<br />

63) To prepare cases of extension of time limits.<br />

64) To assess annual requirements of tools, plants, equipments<br />

and to ensure proper and efficient working of all tools,<br />

instruments and equipments belonging to the department<br />

maintain the inventory of same and to submit proposal for<br />

Budget provision, if necessary.<br />

Page 1729

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!