15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1683<br />

29. To take periodical review of stock items and to place<br />

requirement<br />

to Material Management Department.<br />

30. To take periodical review of pending cases and to obtain the<br />

AGM(C)/CEC/DyCEC’s orders.<br />

31. To take periodical review of confidential/ performance reports<br />

of<br />

Contractors received from the zonal offices.<br />

32. To prepare periodical programme of Electrical Works.<br />

33. To assist the superiors in conducting test for selection of<br />

candidates for the Electrical Sections.<br />

34. To finalize the proposals of Lift installations, renewals, repairs<br />

and liaise with Inspector of Lifts.<br />

35. To finalize the proposals for requirement of Uninterriptible<br />

Power<br />

OLTAS<br />

Supply Units including inspection and testing, LAN and<br />

data cable network with optical fiber cables/UTP/STP cables.<br />

36. To finalize the tender for Annual Maintenance Contracts for<br />

lifts, UPS, Fire Fighting Equipments etc.<br />

Page 1683

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!