15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Labour: (a)Minimum of the grade + Maximum of the Grade<br />

This will give the salary / wages per head per day.<br />

2<br />

Plus<br />

(b) D.A. as per the monthly cost adopted for Establishment Schedule<br />

for the year for which firm quotations are to be given<br />

(c) H.R.A.<br />

(d) Cost of Bus Tokens.<br />

(e) L.T.A.<br />

(f) Ex-gratia.<br />

(g) Overhead charges of 135% for bus division and 18% for Supply<br />

Division on labour.<br />

The basis adopted for submitting firm quotations for work carried out<br />

under the provisions of Indian Electricity Act is as follows:<br />

1) Material a) Book value (as on 1 st January)<br />

b) plus 10% variation<br />

c) plus 10% overhead on (a) + (b)<br />

804<br />

2)Labour Basic Salary / Wages per day on the basis of<br />

Plus ancillary costs.<br />

daily average for the category (for the financial<br />

year).<br />

Plus 25% supervision charges.<br />

In case of jobs carried out for the B & C Department, Government of<br />

Maharashtra, cost sheets are prepared on the basis of the above<br />

formula.<br />

Meter Connection Fee:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!