15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

834<br />

(c) Bills initiated by the Correspondence Department, North, are<br />

checked with various documents in respect of recoupment of<br />

Revenue Stamps, Franking Machines, Imprest Cash, etc.<br />

(d) The Dishonoured Cheques Register of the Cash Department,<br />

North, and the Consumers Department, North, are checked to<br />

ascertain that amounts are realized for cheques dishonoured.<br />

(e) The Shortage and Excess Registers are checked with Cash<br />

Challans to ascertain posting of correct amounts in respective<br />

Registers and recoveries of shortages from the employees<br />

concerned.<br />

(f) The Bank Reconciliation Statement, monthwise, is checked with<br />

the records of the Cash Department, State Bank of India, etc.<br />

(g) Cash Receipt Books of departments at Dadar are checked with<br />

the Cash Remittance Slips Register.<br />

(h) Electricity bills initiated by departments at Dadar payable to the<br />

M/s. Reliance Electric Energy Ltd. are verified from records<br />

maintained there and then released for payment.<br />

(i) Locker Deposit Refunds, Workmen’s Compensation Relief Bills of<br />

the Transportation Engineering Department and Imprest<br />

Recoupment Bills of all departments at Dadar are verified from<br />

the various registers maintained there.<br />

8.4 PROCEDURE IN THE UNDERTAKING<br />

Working of the Consumers Department:<br />

The Distribution and Commercial Department receive requisitions<br />

submitted as per Electricity Act, 2003, for laying new Electric Supply<br />

Lines, connections, reconnections, change of service line, meters, etc.<br />

However, the Electricity Act 2003, is introduced by repealing earlier<br />

Act.<br />

When submitting a requisition the intending consumer pays a<br />

registration fee which is non-refundable. The fees<br />

for requisition, connection, reconnection, etc. are charged as stated in<br />

the Conditions of Supply approved by Government. Following<br />

investigations by the inspectoral staff, the department informs the<br />

intending consumer in writing stating the requirements required to be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!