09.12.2012 Views

Server Alarms - Avaya Support

Server Alarms - Avaya Support

Server Alarms - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Communication Manager Maintenance Object Repair Procedures<br />

This test runs on EXP-INTF (Expansion Interface Circuit Pack).<br />

Table 472: Expansion Interface Lightwave Transceiver Looparound Test (#242) 1 of 5<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1002 ABORT The system could not allocate time slots for the test. The system may be<br />

under heavy traffic conditions, or it may have time slots out-of-service<br />

due to TDM-BUS errors. A system is considered under heavy traffic<br />

when the Call Processing Occupancy is greater than 50% or when the<br />

System Management and the Call Processing Occupancies together<br />

exceed 65%.<br />

1. Enter status health to view the occupancy measurements.<br />

2. Enter display errors and resolve any TDM-BUS (TDM Bus)<br />

errors.<br />

3. If the system has no TDM-BUS errors and is not handling heavy<br />

traffic, retry the command at 1-minute intervals up to 5 times.<br />

1003 ABORT The system could not allocate a tone receiver for the test. The system<br />

may be oversized for the number of Tone Detectors present, or some<br />

Tone Detectors may be out of service.<br />

1. Enter list measurements tone-receiver to see information<br />

regarding the system’s tone receivers.<br />

2. Resolve any TTR-LEV (TTR Level) errors.<br />

3. Resolve any TONE-PT (Tone Generator) errors.<br />

4. Retry the command at 1-minute intervals up to 5 times.<br />

1015 ABORT The EI circuit pack has not been busied out.<br />

1. Busyout the EI circuit pack with busyout board location<br />

2. Enter test board location long.<br />

1031 ABORT If the EI circuit pack is in a PN and is on the active PNC, and is not part of<br />

a PN-to-PN link, this test cannot be executed. If the lightwave transceiver<br />

looparound is activated, it is impossible to deactivate it.<br />

1. If PNC Duplication is enabled, attempt to make the standby PNC<br />

active with reset pnc interchange.<br />

2. If the PNC Interchange is successful, the Lightwave Transceiver<br />

Looparound test may now be executed on the original EI circuit pack.<br />

1678 Maintenance <strong>Alarms</strong> for <strong>Avaya</strong> Communication Manager, Media Gateways and <strong>Server</strong>s<br />

1 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!