Communication Manager Maintenance Object Repair Procedures<br />

This test starts at the specified DS1 converter circuit pack location, traverses over the specified<br />

facility, and loops at the internal facility interface on the other DS1 converter circuit pack in the<br />

DS1 converter complex. See Figure 144: Far-End Internal Loopback Test Configuration.<br />

The test sends digital data through every DS1 channel on this facility. For TN574 DS1<br />

Converter facilities, test patterns are sent through every DS1 channel. For TN1654 DS1<br />

Converter facilities, test patterns are sent through one DS1 channel.<br />

If there is only one DS1 facility available, the system will not allow that last facility to be busied<br />

out. In that case, the DS1 converter circuit pack must be busied out before executing this test.<br />

For a standard-, duplex-, or high-reliability system (no PNC duplication), if there is only one DS1<br />

facility available, then this test can only be executed at the endpoint that is closer to the server<br />

relative to the neighbor DS1 converter circuit pack because of its impact on the system control<br />

links. For TN574 DS1 converter boards, the completion of the test will be delayed in this<br />

configuration to wait for the recovery of the system control links. For a critical-reliability system<br />

(PNC duplication) or for a system with multiple DS1 facilities, the test can be executed on any<br />

DS1 converter circuit pack.<br />

If the test passes on a TN1654 DS1 facility, the round trip delay time appears in milliseconds in<br />

the Error Code field. The round trip delay time is the length of time in milliseconds it takes for<br />

the firmware to receive the test pattern after it has been sent.<br />

This test runs on the DS1-FAC (DS1 Facility) maintenance object.<br />

Figure 144: Far-End Internal Loopback Test Configuration<br />

Table 549: Far-End Internal Loopback Test (#797) 1 of 3<br />

Error<br />

Code<br />

DS1CONV<br />

A<br />

Test starts here<br />

Test<br />

Result<br />

CSU<br />

A<br />

DS1 Facility<br />

Description / Recommendation<br />

Loop at internal interface<br />

for the DS1 facility<br />

. . .<br />

. DS1CONV<br />

. B<br />

.<br />

. . . .<br />

2000 ABORT Timed out while waiting for a response from the circuit pack.<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

1862 Maintenance <strong>Alarms</strong> for <strong>Avaya</strong> Communication Manager, Media Gateways and <strong>Server</strong>s<br />

CSU<br />

B<br />