Communication Manager Maintenance Object Repair Procedures<br />

This test runs on DS1C-BD (DS1 Converter Circuit Pack) and DS1-FAC (DS1 Facility).<br />

Table 560: Failure Audit Test (#949)<br />

Error<br />

Code<br />

2000<br />

2100<br />

2300<br />

2301<br />

Test<br />

Result<br />

Description / Recommendation<br />

ABORT Test timed out while waiting for a response from the circuit pack.<br />

Could not allocate the necessary system resources to run this test.<br />

The downlink message necessary to run this test could not be sent.<br />

The timer could not be set for the downlink message.<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

2316 ABORT Fiber link is not administered.<br />

1. Enter add fiber-link to administer the DS1 converter fiber link.<br />

2500 ABORT Internal system error<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

0 NO<br />

BOARD<br />

FAIL The DS1 converter circuit pack reported failures or retransmitted a<br />

cleared failure message.<br />

1. Enter display errors and follow the repair procedures for any<br />

DS1C-BD (DS1 Converter Circuit Pack) and DS1-FAC (DS1<br />

Facility) errors.<br />

PASS The DS1 converter circuit pack has no failures.<br />

PN Cold Restart Test (#955)<br />

See NO BOARD for repair procedures.<br />

PN Cold Restart, or PN Reset Level 2, is used as an error recovery mechanism for a PN that<br />

has been taken out of service. Once a PN has gone out of service, a PN Cold Restart is<br />

required to bring it back into service.<br />

When a PN is taken out of service, all originating and terminating calls on the affected PN are<br />

dropped and new phone calls cannot be made. During the restart, all hardware on the affected<br />

PN will be re-initialized. The restart takes no longer than 2 minutes.<br />

When the link has been down for 60 seconds, the PN is taken out of service. When the link<br />

comes up, a PN cold restart will occur automatically. See PN Warm Restart Test (#956).<br />