09.12.2012 Views

Server Alarms - Avaya Support

Server Alarms - Avaya Support

Server Alarms - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 603: ATM Remote Layer 3 Query Test (#1291) 2 of 2<br />

Error<br />

Code<br />

2500<br />

none<br />

Test<br />

Result<br />

Description / Recommendation<br />

ATM Board DSP Test (#1293)<br />

ATM Board DSP Test (#1293)<br />

ABORT Internal system error or administration problem<br />

1. Determine whether any B-Channels are administered.<br />

2. If there are none, this is a normal ABORT since this test cannot run<br />

unless at least one B-Channel is administered.<br />

3. If at least one B-Channel is administered, there is an internal system<br />

error. Retry the command at 1-minute intervals up to 5 times.<br />

FAIL Internal system error<br />

1. See description of ABORT with Error Code 2500.<br />

PASS A message was sent to the far-end switch or terminal adapter. The ISDN<br />

PRI specification allows up to 2 minutes for a reply.<br />

1. Check the Error Log for ATM-SGRP errors of type 2305 for evidence<br />

of a Remote Layer 3 Query failure.<br />

2. If no new errors were logged since this test was run, this switch and<br />

the far-end switch can exchange call control messages.<br />

3. If there is still a problem with a particular ATM trunk, busyout the trunk<br />

and run the long test sequence. Note the results of ISDN Test Call<br />

Test (#258).<br />

This test checks the board’s interface to the TDM bus and the functions of all 24 on-board DSPs<br />

(Digital Signal Processors). There are three functional types of DSPs:<br />

● talkers – put data on the TDM bus<br />

● listeners – take data off the TDM bus<br />

● echo cancellers – filter out echoes of the main transmission<br />

If the test fails for every DSP, a MAJOR alarm is raised against the board.<br />

If the test fails for one or more DSPs, a MINOR alarm is raised.<br />

If a DSP is busy, the test for that particular DSP is considered passed.<br />

2 of 2<br />

Communication Manager Release 5.0 Issue 4 January 2008 1979

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!