09.12.2012 Views

Server Alarms - Avaya Support

Server Alarms - Avaya Support

Server Alarms - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Communication Manager Maintenance Object Repair Procedures<br />

Table 579: CSU Repeater Loopback Test (#1211) 2 of 3<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1039 ABORT The DS1 Interface circuit pack is providing timing for the system. Executing<br />

this test could cause major system disruption.<br />

If the DS1 Interface circuit pack needs to be tested, set the<br />

synchronization reference to another DS1 Interface circuit pack or to the<br />

Tone-Clock circuit with the following command sequence:<br />

1.disable synchronization-switch<br />

2.set synchronization location<br />

3.enable synchronization-switch<br />

1412 ABORT This test does not run on media modules or media gateways. Ignore.<br />

1950 ABORT Another loopback/span test is already executing on the DS1 board or the<br />

board is in a network requested loopback mode (Line loopback or Payload<br />

loopback). The error log indicates whether a Customer Loopback Jack<br />

test, Far CSU Loopback test, or the One-Way Span test is executing or if<br />

the board is in line loopback or payload loopback mode. Only one<br />

long-duration loopback/span test can be active at a given time.<br />

If a loopback/span test is already active, that test must be deactivated via<br />

test ds1-loop location end-loopback/span-test in order to<br />

run this test.<br />

1951 ABORT The CSU Repeater Loopback test could not be executed because the<br />

120A CSU module/T1 sync splitter was not physically installed. Physically<br />

connect the 120A1 CSU module/T1 sync splitter to the TN767E board on<br />

the back of the port carrier.<br />

2000 ABORT Response to the test was not received within the allowed time.<br />

1. Check for board hyperactivity. See Hyperactive DS1/UDS1 Interface<br />

Circuit Pack/Media Module.<br />

2100 ABORT Could not allocate the necessary system resources to run this test.<br />

1. Retry the command at 1-minute intervals up to 5 times.<br />

FAIL DS1 Interface circuit pack failed the CSU Repeater Loopback test.<br />

1. Retry test ds1-loop location ds1/csu-loopback-tests.<br />

2. If the RLB test continues to fail, and the CSU Equipment Loopback<br />

test (#1210) passed, replace the CSU module/T1 sync splitter.<br />

1932 Maintenance <strong>Alarms</strong> for <strong>Avaya</strong> Communication Manager, Media Gateways and <strong>Server</strong>s<br />

2 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!