Table 549: Far-End Internal Loopback Test (#797) 2 of 3<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

Far-End Internal Loopback Test (#797)<br />

2100 ABORT Could not allocate the necessary system resources to run this test<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

2300 ABORT The downlink message necessary to run this test could not be sent.<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

2301 ABORT The timer could not be set before sending the downlink message.<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

2316 ABORT Fiber link is not administered.<br />

1. Enter add fiber-link to administer the DS1 converter.<br />

2321 ABORT DS1 facility is not busied out.<br />

1. Enter busyout ds1-facility to busyout the DS1 facility.<br />

2. If there is only one DS1 facility, use busyout board to busyout the<br />

DS1 converter circuit pack.<br />

2332 ABORT For this system configuration, the test cannot run at the far end when<br />

there is only one DS1 facility available.<br />

1. Run the test at the other end of the DS1 converter complex.<br />

2500 ABORT Internal system error<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

2 of 3<br />

Communication Manager Release 5.0 Issue 4 January 2008 1863