● SYNC (Port Network Synchronization)<br />

Table 491: Synchronization Update Test (#417)<br />

Error<br />

Code<br />

None<br />

1000<br />

1115<br />

2500<br />

Test<br />

Result<br />

Description / Recommendation<br />

Digital Port Sanity Test (#565)<br />

Digital Port Sanity Test (#565)<br />

ABORT Internal system error.<br />

System resources required to run this test are not available.<br />

Could not allocate the necessary system resources to run this test.<br />

Internal system error.<br />

1. Retry the command at 1-minute intervals up to 3 times.<br />

PASS The Synchronization Maintenance parameters have been successfully<br />

updated. The system should be synchronized. If synchronization<br />

problems still exist, refer to the Error Log to obtain information about<br />

the source of the problem.<br />

The Digital Port Sanity Test verifies that the port circuitry involved in the digital trunk testing on<br />

the Maintenance/Test digital port is functioning properly. This circuitry is common to both<br />

Maintenance/Test digital ports on the Maintenance/Test circuit pack and is only run for port 2.<br />

The test aborts if it is run on port 3.<br />

The test connects the two Maintenance/Test digital ports on the TDM bus so that they talk and<br />

listen to each other. Four self-tests are attempted:<br />

● sending data from port 2 to port 3 in asynchronous mode<br />

● sending data from port 3 to port 2 in asynchronous mode<br />

● sending data from port 2 to port 3 in synchronous mode<br />

● sending data from port 3 to port 2 in synchronous mode<br />

The test passes if all four self-tests are successful. The test stops if any one of the self-tests<br />

fails.<br />

This test aborts if an ISDN test call is in progress on the Maintenance/Test digital port when the<br />

test is requested, or if an ISDN test call is initiated while the test is in progress.<br />