09.12.2012 Views

Server Alarms - Avaya Support

Server Alarms - Avaya Support

Server Alarms - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Far CSU Loopback Test (#1213)<br />

Enter busyout board to busy out all trunks or ports on the DS1 Interface circuit pack before<br />

running the Far CSU Loopback test.<br />

If the DS1 is administered for ami-zcs line coding and the far-end CSU is not a 120A CSU<br />

module or a 401A T1 sync splitter, density protection on the CSU must be disabled during the<br />

test due to the large number of zero’s in the 3-in-24 test pattern.<br />

The Far CSU Loopback test has the DS1 Interface circuit pack transmit a loopback activation<br />

code to the remote CSU, waits up to 15 seconds for return of the code to verify the loopback<br />

has been established, transmits a framed 3-in-24 test pattern, begins counting bit errors in the<br />

received test pattern, and returns a PASS result. If the loopback is not established within the 15<br />

seconds, the test fails.<br />

The status of the Far CSU Loopback test appears in the error log as Error Type 3901. Several<br />

aux values give information on the status of the test.<br />

Enter list measurements ds1 summary to show the length of time the test has been running<br />

(Test Duration field) and number of bit errors detected (Loopback/Span Test<br />

Bit-Error Count field). If the test pattern is passed through the loopback cleanly, the<br />

number of bit errors should be very low. The command also shows the type of loopback/span<br />

test executing (Test field), the type of pattern generated for the loopback/span test (Pattern<br />

field), and whether the pattern (i.e., 3-in-24 Pattern) is synchronized (Synchronized field).<br />

Enter test ds1-loop location end-loopback/span-test to end the test.<br />

Enter release board location to restore all trunks or ports on the DS1 Interface circuit<br />

pack to the in-service state.<br />

This test is run on the DS1-BD (DS1 Interface Circuit Pack) and UDS1-BD (UDS1 Interface<br />

Circuit Pack) maintenance objects.<br />

Table 581: Far CSU Loopback Test (#1213) 1 of 3<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

ABORT Internal system error<br />

1. Run test ds1-loop location<br />

far-csu-loopback-test-begin at 1-minute intervals up to 5<br />

times.<br />

1005 ABORT Far CSU Loopback test cannot be executed in the current configuration. To<br />

run this, the DS1 must be administered for 24-channel operation. The Bit<br />

Rate field on the DS1 circuit pack administration screen must be set to<br />

1.544 for 24-channel operation.<br />

1 of 3<br />

Communication Manager Release 5.0 Issue 4 January 2008 1937

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!