Communication Manager Maintenance Object Repair Procedures<br />

j. Error Type 1301: CSU module/T1 sync splitter not expected. The 120A CSU or T1 sync<br />

splitter is physically connected to the TN767E board on the back of the port carrier, but the<br />

Near-End CSU Type field on the add ds1 screen has not been administered as<br />

integrated.<br />

If the 120A CSU or T1 sync splitter is to be used, use change ds1 to change the<br />

Near-End CSU Type field to integrated. Otherwise, physically remove the 120A CSU<br />

or T1 sync splitter from the back of the port carrier.<br />

k. Error Type 1302: DS1 configuration error. Attempting to use a 120A CSU with a TN767E<br />

circuit pack that is configured for 32-channel (2.048-Mbps) operation. This CSU only works<br />

with a DS1 board configured for 24-channel (1.544-Mbps) operation in the United States of<br />

America.<br />

l. Error Type 1303: DS1 circuit pack suffix incorrect for CSU or T1 sync splitter. The<br />

Near-End CSU Type field on the add ds1 screen has been administered as<br />

integrated but the DS1 circuit pack is not a TN767E (or higher-suffixed) DS1 board.<br />

If the 120A CSU or T1 sync splitter is to be used, remove the circuit pack and replace it with<br />

a TN767E (or higher-suffixed) board. Otherwise, use change ds1 to change the<br />

Near-End CSU Type field to other.<br />

m. Error Type 1310: BLB failure. This error occurs when the DS1 Board Loopback (BLB)<br />

demand test fails. Repeat the test using busyout board location, test ds1-loop<br />

location ds1/csu-loopback-tests, release board location. If the BLB test<br />

continues to fail, then the TN767E circuit pack needs to be replaced.<br />

n. Error Type 1311: ELB failure. This error occurs when the Integrated CSU (I-CSU) Module<br />

Equipment Loopback (ELB) test fails. This test is executed during I-CSU/T1 sync splitter<br />

power-up/reset (i.e., the TN767E board is physically inserted and the CSU module/T1 sync<br />

splitter is already installed) or when the CSU module/T1 sync splitter is plugged on to an<br />

already initialized DS1 board. The ELB test is also executed as part of test ds1-loop<br />

location ds1/csu-loopback-tests.<br />

Attempt to clear the alarm with busyout board location, test ds1-loop location<br />

ds1/csu-loopback-tests, and release board location. If the ELB test continues<br />

to fail, then either the TN767E board, the CSU module, the T1 sync splitter, or the I/O cable<br />

between the backplane and the CSU module/T1 sync splitter (or any combination thereof)<br />

has failed. Escalate this problem.<br />

o. Error Type 1312: RLB failure. This error occurs when the Integrated CSU (I-CSU) Module<br />

Repeater Loopback (RLB) test fails. This test is executed during I-CSU/T1 sync splitter<br />

power-up/reset (i.e., the TN767E board is physically inserted and the CSU module/T1 sync<br />

splitter is already installed) or when the CSU module/T1 sync splitter is plugged on to an<br />

already initialized DS1 board. The RLB test is also executed as part of the command test<br />

ds1-loop location ds1/csu-loopback-tests.<br />

Attempt to clear the alarm with busyout board location, test ds1-loop<br />

location ds1/csu-loopback-tests, and release board location. If the RLB<br />

test continues to fail, then the CSU module/T1 sync splitter needs to be replaced.<br />