09.12.2012 Views

Server Alarms - Avaya Support

Server Alarms - Avaya Support

Server Alarms - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Communication Manager Maintenance Object Repair Procedures<br />

PPP Link Status Inquiry Test (#1279)<br />

The PPP Link Status Inquiry Test determines the state of the PPP link. The test passes only if<br />

the link is up.<br />

This test runs on PPP-PT (Control LAN Packet/Port).<br />

Table 598: PPP Link Status Inquiry Test (#1279) 1 of 2<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1124 ABORT PPP link is not enabled.<br />

1. Verify that the PPP link is enabled with status port location,<br />

status link n, or display data-module.<br />

2. If the link is not enabled, enable the link with change data-module<br />

3. Repeat the test.<br />

1125 ABORT PPP Link is not in service.<br />

1. Verify whether PPP link is in-service with status port location<br />

or status link n.<br />

2. If the PPP link is not in service, release the link with<br />

release link n or release port location<br />

3. Repeat the test.<br />

2100 ABORT Could not locate the necessary system resources to run this test.<br />

1. Retry the command at 1-minute intervals up to 5 times.<br />

2500 ABORT Internal system error.<br />

1. Retry the command at 1-minute intervals up to 5 times.<br />

1968 Maintenance <strong>Alarms</strong> for <strong>Avaya</strong> Communication Manager, Media Gateways and <strong>Server</strong>s<br />

1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!