Critical Pathway Method (CPM) for Construction Planning<br />

in University Malaysia Terengganu: Makmal Sains Nautika<br />

Ko Foo Weng<br />

Supervisor: Dr. Nur Aidya Hanum Binti Aizam<br />

Bachelor of Science (Computational Mathematics)<br />

School of Informatics and Applied Mathematics<br />

This research is to solve a construction project problem using Critical Pathway Method<br />

(CPM). CPM plays an important in controlling and monitoring the whole construction<br />

project as to ensure the construction schedule is on the right track. A construction project<br />

often facing problems of not completing on time due to poor scheduling. Therefore, the<br />

aim of this project is to minimize the duration of completing a construction project and<br />

to try decrease the delays of completion time by providing a well arrange construction<br />

plan. The construction project used for this particular study is on Makmal Sains Nautika,<br />

which located in University Malaysia Terengganu. The Master Programme of Work is<br />

obtained from Pusat Pembangunan dan Harta to calculate the CPM and Microsoft Office<br />

Project is used to improve the accuracy of calculation. The complete results with further<br />

discussions and suggestions are presented together in this research.<br />

935 | UMT UNDERGRADUATE RESEARCH DAY 2018