13.05.2018 Views

merged

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Improving the Accuracy of Primary Productivity from Satellite Imaginary<br />

(MODIS) using Hybrid Partial L-Moment and Bootstrap Method in Kuala<br />

Terengganu Offshore, Terengganu, Malaysia.<br />

Nor Arine Binti Ab.Rahman<br />

Supervisor: Assoc. Prof. Dr. Muhamad Safiih Bin Lola<br />

Bachelor of Science (Computational Mathematics)<br />

School of Informatics and Applied Mathematics<br />

The use of Vertical Generalized Production Model (VGPM) is exposed to larger error value,<br />

which may affect the accuracy of the results. Therefore, this project attempts to hybridize<br />

bootstrap approach with Partial L-Moment to obtain accurate estimation results. The<br />

proposed model is applied to the data from the satellite imaginary (MODIS) in Setiu. The<br />

findings indicate that the Partial L-Moment with bootstrap approach is the best model<br />

compared to the Vertical Generalized Production Model since the error produced are<br />

smaller. This shows that the proposed model is best to use in the measurement. It can<br />

be concluded that the application of Partial L-Moment with bootstrap method is very<br />

useful to provide more accurate decisions. Therefore, the measurements obtained may<br />

provide useful information for policy makers and researchers in the field of marine.<br />

964 | UMT UNDERGRADUATE RESEARCH DAY 2018

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!