19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 286: Conference Circuit Test (#7) 6 of 7<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

Conference Circuit Test (#7)<br />

Any FAIL The NPE of the <strong>test</strong>ed port did not conference the tones correctly. This<br />

causes noisy <strong>and</strong> unreliable connections.<br />

ADX16A-P, DIOD-DS1, ISDN-TRK, PE-BCHL, S-SYN-PT, VC-SUMPT,<br />

WAE-PORT:<br />

1. Replace the circuit pack.<br />

ANL-16-L, AN-LN-PT, DAT-LINE:<br />

1. Enter display port location <strong>and</strong> status station<br />

extension to determine whether the station is idle.<br />

2. If the station is idle, enter <strong>test</strong> port location for this port.<br />

3. If the <strong>test</strong> continues to fail, enter busy port location <strong>and</strong><br />

release port location, <strong>and</strong> then re<strong>test</strong>.<br />

4. If the <strong>test</strong> still fails, replace the circuit pack.<br />

CO-DS1, DID-DS1, OPS-LINE, TIE-DS1:<br />

1. Enter list configuration board location. The circuit pack<br />

must be a TN767C V3 or later. Check the <strong>error</strong> log for Error Type<br />

1281 entries.<br />

2. Test every administered trunk on the board. If one fails, this could be<br />

an off-board problem (such as an incoming seizure or an off-hook<br />

port seizure during the <strong>test</strong>). Re<strong>test</strong> the board.<br />

3. If every port fails, a -5 Volt power problem is indicated. Check<br />

CARR-POW (Carrier Power Supply) or RMC-ENV (Power/Fan<br />

Sensors) for troubleshooting procedures. If a red LED is lit on a<br />

TN736 or TN752 power unit circuit pack, replace the circuit pack.<br />

4. If several ports fail, check the <strong>error</strong> log for TONE-BD (Tone-Clock<br />

Circuit Pack) or TONE-PT (Tone Generator) <strong>error</strong>s. If there are such<br />

<strong>error</strong>s, take the appropriate action. When the TONE <strong>error</strong>s have<br />

cleared, rerun the <strong>test</strong>.<br />

5. If the retry passes <strong>and</strong> troubles are reported, coordinate isolation<br />

with the CO. Verify that the switch, the CO, <strong>and</strong> any NICE<br />

equipment (the CSI’s) have the correct administration.<br />

6. If the <strong>test</strong> still fails, replace the circuit pack.<br />

6 of 7<br />

Issue 5 May 2009 1097

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!