19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PNC-DUP Related Comm<strong>and</strong>s<br />

ATM PNC-DUP (ATM PNC Duplication)<br />

Table 42: PNC-DUP Comm<strong>and</strong>s lists the PNC-DUP related comm<strong>and</strong>s. Their output forms are<br />

fully described in Maintenance SAT Comm<strong>and</strong>s in Maintenance Comm<strong>and</strong>s for <strong>Avaya</strong> Aura<br />

Communication Manager, Media Gateways <strong>and</strong> Servers (03-300431).<br />

Table 42: PNC-DUP Comm<strong>and</strong>s<br />

Comm<strong>and</strong> Description<br />

status pnc Shows information about both PNCs’ operational status,<br />

including state of health, alarms, busyouts <strong>and</strong> locks.<br />

reset pnc interchange Initiates a dem<strong>and</strong> PNC interchange. If the st<strong>and</strong>by is healthy<br />

(all-zero state-of-health indexes), there is no effect on service.<br />

Otherwise, calls may be dropped.<br />

set pnc Locks or unlocks the active PNC, preventing interchanges.<br />

Does not interfere with double call setup.<br />

busyout pnc Removes the st<strong>and</strong>by PNC from service. See also the section<br />

on busyout of PNC components.<br />

Busyouts <strong>and</strong> PNC-DUP<br />

Busyout pnc puts the st<strong>and</strong>by PNC in the busyout state. In this condition:<br />

● Double call set up is turned off.<br />

● The st<strong>and</strong>by PNC is unrefreshed; existing duplicate call connections are removed.<br />

● PNC interchanges are prevented.<br />

Upon release, interchanges are re-enabled <strong>and</strong> a global refresh of double call setup on the<br />

st<strong>and</strong>by is performed.<br />

When PNC duplication is in effect:<br />

● An active PNC component cot be busied-out.<br />

● A st<strong>and</strong>by PNC component can only be busied-out when the st<strong>and</strong>by PNC is first<br />

busied-out.<br />

● The st<strong>and</strong>by PNC cot be released unless all st<strong>and</strong>by PNC components are released.<br />

Issue 5 May 2009 159

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!