19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Non-control Chel Test (#297)<br />

Non-control Chel Test (#297)<br />

The Non-control Chel Test is executed on the non-control chel bus. The Tone-Clock circuit puts<br />

a tone on the non-control chel bus <strong>and</strong> the Tone Detector circuit listens to it. The <strong>test</strong> passes if<br />

the tone is successfully transmitted on the non-control chel bus.<br />

This <strong>test</strong> runs on TDM-BUS (TDM Bus).<br />

Table 386: Non-control Chel Test (#297)<br />

Error<br />

Code<br />

None<br />

1001<br />

2100<br />

Test<br />

Result<br />

Description / Recommendation<br />

ABORT Could not allocate the necessary system resources to run this <strong>test</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

1005 ABORT This <strong>test</strong> is valid only on the non-control chel bus. It aborts when run on the<br />

control chel bus. This is a valid response. Enter<br />

status port-network to verify which bus is the control chel bus.<br />

2000 ABORT Response from the <strong>test</strong> was not received within the time allowed.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

FAIL Communication on the Non-control Chel is not reliable.<br />

1. Run the comm<strong>and</strong> again.<br />

2. If the problem persists, <strong>test</strong> the active Tone-Clock circuit <strong>and</strong> Tone<br />

Detector circuit/circuit pack in the port network where the faulted<br />

TDM bus resides, to verify they are healthy. See the following to<br />

resolve <strong>error</strong>s:<br />

TONE-PT (Tone Generator)<br />

GPTD-PT (General-Purpose Tone Detector Port)<br />

DTMR-PT (Dual-Tone Multifrequency Receiver Port).<br />

3. Run the comm<strong>and</strong> again.<br />

4. If the problems persists, see TDM-Bus Fault Detection <strong>and</strong> Isolation.<br />

PASS The non-control chel bus is operational.<br />

Issue 5 May 2009 1345

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!