19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATM-SYNC (ATM Synchronization)<br />

2. Test the active Tone-Clock circuit in the master PN with <strong>test</strong> tone-clock<br />

location long.<br />

Check the Error Log for TDM-CLK <strong>error</strong>s, <strong>and</strong> verify that TDM Bus Clock Circuit Status<br />

Inquiry <strong>test</strong> (#148) passes successfully.<br />

If Test #148 fails with an Error Code 2–32, see TDM-CLK (TDM Bus Clock) to resolve<br />

the problem. If not, continue with the following steps.<br />

3. For Duplicated Tone-Clock circuit packs in the master PN: Switch Tone-Clock circuit<br />

packs on the master PN with set tone-clock location.<br />

For Simplex Tone-Clock circuit packs in the master PN: replace the primary <strong>and</strong><br />

secondary (if administered) DS1 Interface circuit packs.<br />

4. Investigate any other SYNC <strong>error</strong>s.<br />

g. Error Type 2049: the ATM Expansion Interface circuit packs have <strong>error</strong>s that affect<br />

synchronization. Test the ATM Expansion Interface circuit pack with <strong>test</strong> board<br />

location. This <strong>error</strong> can take up to one hour to clear.<br />

h. Error Types 1, 257, <strong>and</strong> 513: noise on the DS1 line can cause transient alarms on<br />

synchronization. Therefore, when a synchronization problem occurs on Error Types 1, 257,<br />

or 513, a WARNING alarm is first raised for 15 to 20 minutes before the alarm is upgraded<br />

to a MINOR or MAJOR alarm.<br />

<strong>Dem<strong>and</strong></strong> <strong>test</strong> <strong>descriptions</strong> <strong>and</strong> <strong>error</strong> <strong>codes</strong><br />

Order of Investigation Short Test<br />

Sequence<br />

Long Test<br />

Sequence<br />

D/ND 1<br />

Synchronization Update Test (#417) X X ND<br />

1. D = Destructive, ND = Nondestructive<br />

Issue 5 May 2009 183

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!