CAUTION: Entering<br />

Note: ATM<br />

ESS (Enterprise Survivable Server)<br />

6. Use either <strong>Avaya</strong> Fault <strong>and</strong> Performance Management or the SAT comm<strong>and</strong>s<br />

status ess port-network <strong>and</strong> status ess clusters to verify that all servers<br />

<strong>and</strong> network resources are operational.<br />

! CAUTION:<br />

the comm<strong>and</strong>s below will cause a service interruption. When Port<br />

Networks switch to either a Main server or ESS server, a level 2 restart is initiated<br />

on the Port Network, <strong>and</strong> service will be interrupted to the entire Port Network.<br />

Note that shuffled IP to IP calls will not be dropped, but during the restart, they will<br />

not have any access to features (Hold, Transfer, Conference, etc.).<br />

7. When the Main server(s) <strong>and</strong> network are operational <strong>and</strong> stable, schedule or initiate<br />

an on-dem<strong>and</strong> switchback of Port Networks to the Main server. On the Main server,<br />

use these comm<strong>and</strong>s:<br />

Note:<br />

PNC<br />

When a Port Network which is providing control for other sub-tending Port<br />

Networks via an ATM Expansion Interface (ATM-EI) circuit pack switches to a<br />

server, the other sub-tending Port Networks may or may not end up being<br />

controlled by the same server. All IPSI controlled Port Network(s) in the<br />

configuration will vie for control of the sub-tending Port Networks. The only way to<br />

guarantee that ATM-EI controlled Port Networks will be controlled by the same<br />

server is if all IPSI controlled Port Networks are controlled by that same server.<br />

● Schedule a switchback to the Main with the change system-parmeters ess<br />

comm<strong>and</strong>. See Using <strong>Avaya</strong> Enterprise Survivable Server (ESS) for more<br />

information. The Auto Return field may be set to scheduled or no. If no is used,<br />

the only way to initiate a switchback is by using an on-dem<strong>and</strong> comm<strong>and</strong> (See<br />

below). The survivable-processor <strong>and</strong> system-parameters<br />

port-networks administration screens may be displayed on all ESS servers but<br />

may only be changed on the Main server.<br />

● Initiate an on-dem<strong>and</strong> switchback by entering the get forced-takeover<br />

ipserver-interface port-network N comm<strong>and</strong>. This comm<strong>and</strong> may be<br />

issued with a qualifier for all Port Networks or a single individual port-network<br />

N.<br />

b. Error Type 257: This <strong>error</strong> applies to a Main or ESS server. This <strong>error</strong> is generated when an<br />

ESS server is translated on the Main but is NOT registered with the Main.<br />

For detailed information on maintenance comm<strong>and</strong>s, see Maintenance Comm<strong>and</strong>s for<br />

<strong>Avaya</strong> Aura Communication Manager, Media Gateways <strong>and</strong> Servers (03-300431).<br />

For detailed information on administration comm<strong>and</strong>s, see Using <strong>Avaya</strong> Enterprise<br />

Survivable Server (ESS).<br />

Issue 5 May 2009 413