Removing Fiber Connectivity to an PN<br />

DS1C-BD (DS1 Converter Circuit Pack)<br />

This procedure covers removing the connectivity to an PN or between SNs. Removing an PN<br />

<strong>and</strong> its associated carrier <strong>and</strong> circuit packs can be h<strong>and</strong>led on a board-type basis.<br />

If this system is duplicated, start with step 1; otherwise, start with step 6.<br />

Note: The<br />

WARNING: Do<br />

WARNING: In<br />

Note:<br />

following procedure is generic in its scope. Check the customer’s switch<br />

configuration for EI/SNI structures.<br />

not power down a Switch Node carrier to replace a circuit pack.<br />

duplicated PNC configurations, one DS1-CONV complex in the fiber-link<br />

serves as the active <strong>and</strong> the second DS1-CONV complex serves as the st<strong>and</strong>by.<br />

Each DS1 Converter complex consists of two TN574 or TN1654 circuit packs.<br />

Table 97: Removing Fiber Connectivity from a PN 1 of 2<br />

Step Comm<strong>and</strong>/Step Description<br />

1. status pnc Verify that the A-side is active.<br />

1. If the B-PNC is active, enter<br />

reset pnc-interchange<br />

2. Verify that the A-side is active<br />

(status pnc).<br />

3. busyout pnc st<strong>and</strong>by Busyout the duplicated switch side.<br />

4. change system-parameters<br />

duplication<br />

Disable PNC duplication by setting the<br />

Enable Operation of PNC<br />

Duplication field to n.<br />

5. list fiber-link List administered fiber connections by<br />

number. Record the endpoints (EIs, SNIs,<br />

<strong>and</strong> DS1Cs), <strong>and</strong> fiber link numbers that you<br />

are removing.<br />

6. busyout fiber-link n Busyout the fiber link of interest. The fiber link<br />

number (step 4) is n for this comm<strong>and</strong>.<br />

7. remove fiber- link n Remove the link administration for this link.<br />

8. change system-parameters<br />

duplication<br />

9. Physically remove the a-pnc <strong>and</strong><br />

b-pnc fiber endpoint circuit packs<br />

Enable PNC duplication by changing the<br />

Enable Operation of PNC<br />

Duplication field to y.<br />

Physically remove EI, SNI, <strong>and</strong> DS1C circuit<br />

packs associated with the b-pnc.<br />