19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

PN Maintenance Circuit Pack Serial Link Test (#337)<br />

This <strong>test</strong> is destructive.<br />

This <strong>test</strong> checks the serial link from the st<strong>and</strong>by EI or st<strong>and</strong>by IPSI circuit pack to the PN’s<br />

Maintenance circuit pack. If there is no st<strong>and</strong>by link or the st<strong>and</strong>by link is down at the time of the<br />

<strong>test</strong>, this <strong>test</strong> aborts.<br />

Note:<br />

Note: The status of the link changes to “down” when the st<strong>and</strong>by EI or st<strong>and</strong>by IPSI<br />

circuit pack begins initialization <strong>test</strong>s (for example, after being reset). The link<br />

status updates at the conclusion of these <strong>test</strong>s.<br />

This <strong>test</strong> runs on MAINT (PN Maintenance Circuit Pack).<br />

Table 395: PN Maintenance Circuit Pack Serial Link Test (#337) 1 of 2<br />

Error<br />

Code<br />

1000<br />

2029<br />

2500<br />

Test<br />

Result<br />

Description / Recommendation<br />

ABORT System resources required for this <strong>test</strong> are not available.<br />

Internal system <strong>error</strong>.<br />

Internal system <strong>error</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

1362 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!