19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

M/T-DIG (Maintenance/Test Digital Port)<br />

The Maintenance/Test digital port is a port on the TN771D circuit pack. Ports 2 <strong>and</strong> 3 are digital<br />

ports. The Maintenance/Test digital port provides the ability to perform digital (i.e., ISDN-PRI)<br />

trunk <strong>test</strong>ing via the TDM bus. For an ISDN-PRI <strong>test</strong> call, connections are set up in the system<br />

as shown in Figure 49: ISDN-PRI Outgoing Test Call.<br />

When the Maintenance/Test digital port is participating in an ISDN-PRI <strong>test</strong> call, the port sends a<br />

stream of pseudo-r<strong>and</strong>om data along the connected B-Channel. The far end loops back this<br />

data, <strong>and</strong> the Maintenance/Test digital port compares the data to that which was sent. Errors are<br />

recorded on a bit <strong>and</strong> block basis. Refer to ISDN-TRK (DS1 ISDN Trunk) for more information<br />

about ISDN-PRI <strong>test</strong> calls.<br />

The Maintenance/Test digital port maintenance ensures that the digital trunk <strong>test</strong>ing function is<br />

operating correctly. The Maintenance/Test digital port is alarmed if maintenance determines that<br />

the digital port is operating incorrectly.<br />

Note: An<br />

MO Name<br />

in Log<br />

Alarm<br />

Level<br />

Initial Comm<strong>and</strong> to Run Full Name of MO<br />

M/T-DIG MIN <strong>test</strong> port location l Maintenance/Test Digital Port<br />

WRN release port location<br />

Note:<br />

alarm on the Maintenance/Test digital port reduces service, but does not block<br />

it since the ISDN-TRK has other means to determine the health of the ISDN-PRI<br />

trunk facility. However, to accurately measure the <strong>error</strong> performance <strong>and</strong> to<br />

ensure accuracy of the health of the ISDN-PRI trunk, the Maintenance/Test circuit<br />

pack should be replaced when a new circuit pack is available.<br />

680 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!