Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

BRI Remote Loopback Test (#627)<br />

This <strong>test</strong> checks the integrity of a circuit-switched B-Chel connection between the switch <strong>and</strong><br />

the endpoint.<br />

The endpoint is put in the “maintenance busy” state to prevent the switch from entering calls to<br />

the endpoint during the <strong>test</strong>. An application message containing a loopback activate request for<br />

the appropriate B-Chel is sent to the endpoint. The endpoint responds with a loopback activated<br />

response. The switch then sends data to the endpoint over the B-Chel under <strong>test</strong>. Since the<br />

B-Chel is looped back at the endpoint, maintenance should receive the data that it sent. If no<br />

data is detected, the <strong>test</strong> fails. The switch then releases the endpoint so that it is available to<br />

terminate calls.<br />

This <strong>test</strong> is not executed for ASAI adjuncts because adjuncts do not support MIMs upon which<br />

this <strong>test</strong> is based. This <strong>test</strong> is run on BRI-SET, Various Adjuncts.<br />

Table 422: BRI Remote Loopback Test (#627) 1 of 4<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1000 ABORT Could not seize the endpoint or B-Chels for <strong>test</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2. If the <strong>test</strong> continues to abort, escalate the problem.<br />

1005 ABORT The endpoint’s MIMs <strong>Support</strong>ed field is administered to “no.”<br />

1. Enter change station extension to change the field only if the<br />

endpoint documentation reflects support for ISDN-BRI Management<br />

<strong>and</strong> Maintenance Procedures.<br />

1113 ABORT The signaling link between the switch <strong>and</strong> the endpoint is down.<br />

1. Enter <strong>test</strong> port location long to clear any <strong>error</strong>s that<br />

prevent establishment of the signaling link.<br />

2. Examine the results of the Signaling Link Status <strong>test</strong> (#626) that is<br />

run as part of this comm<strong>and</strong>. If this <strong>test</strong> aborts or fails, follow the<br />

repair procedure for Signaling Link Status Test (#626).<br />

3. If the XID <strong>test</strong> (#628) continues to abort, escalate the problem.<br />

1414 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

1 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!