19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 23: DS1 Converter Complex in Duplicated PNC with 1 SN<br />

Metallic<br />

or Fiber<br />

Connection<br />

D S1CONV<br />

S<br />

N<br />

I<br />

E<br />

I<br />

S<br />

N<br />

I<br />

E<br />

I<br />

DS1 Facilities<br />

E<br />

I<br />

Fiber Link<br />

Fiber Link<br />

D S1CONV<br />

E<br />

I<br />

D S1CONV<br />

DS1 Converter Administration <strong>and</strong> Board Insertion<br />

. . .<br />

Metallic or Fiber Connection<br />

SN A-PNC<br />

DS1 Facilities<br />

Metallic<br />

or Fiber<br />

Connection<br />

DS1C-BD (DS1 Converter Circuit Pack)<br />

PPN<br />

Board insertion is the detection of a circuit pack by the system. The DS1 converter circuit pack<br />

will not be inserted unless the circuit pack type, TN574 or TN1654, is entered into the<br />

associated field in circuit pack administration screen. The Fiber Endpoint (the EI or the SNI)<br />

must also be inserted <strong>and</strong> be operational for the DS1 converter circuit pack to function.<br />

Fiber link administration must be completed before the DS1 converter maintenance can be<br />

operational. Fiber links are administered via add fiber-link. Fiber Endpoints, DS1<br />

converter circuit pack locations <strong>and</strong> DS1 facility options are entered as a part of the fiber link<br />

administration.<br />

D S1CONV<br />

S<br />

N<br />

I<br />

S<br />

N<br />

I<br />

. . .<br />

SN B-PNC<br />

EPN<br />

Issue 5 May 2009 375

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!