19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Enter <strong>test</strong> board location, <strong>and</strong> verify that every <strong>test</strong> passes.<br />

Critical Reliability<br />

ATM-EI (Expansion Interface Circuit Pack)<br />

There are 2 ATM-EI circuit packs in each PN.<br />

1. Enter status pnc on the SAT. If the board is on the active side, enter reset pnc<br />

interchange to switch the active ATM-EI board to the st<strong>and</strong>by side.<br />

2. Enter busyout pnc-st<strong>and</strong>by.<br />

3. Enter busyout atm pnc # a-pnc or b-pnc.<br />

4. Replace the circuit pack.<br />

5. Enter release atm pnc #.<br />

6. Enter release pnc-st<strong>and</strong>by.<br />

7. Wait 2½ minutes for board insertion.<br />

8. Enter <strong>test</strong> board location, <strong>and</strong> verify that every <strong>test</strong> passes.<br />

Basic ATM PNC Administration<br />

Note:<br />

Note: This section contains basic administration information only. Refer to ATM<br />

Installation, Upgrades, <strong>and</strong> Administration using <strong>Avaya</strong> Communication Manager,<br />

555-233-124, for more detailed information.<br />

ATM PNC connections involve administering<br />

● 1 ATM-EI board in each PN (st<strong>and</strong>ard, duplex, or high reliability)<br />

● 2 ATM-EI boards in each PN (critical reliability)<br />

Adding ATM PNC Connections<br />

St<strong>and</strong>ard, Duplex or High Reliability<br />

1. If the ATM-EI circuit pack is absent or if the circuit pack is present but in a PN, use the<br />

change circuit-pack comm<strong>and</strong> to add circuit pack translations.<br />

2. Enter add atm pnc n (connection number), <strong>and</strong> administer the circuit pack’s location<br />

<strong>and</strong> its ATM address.<br />

Critical Reliability<br />

1. Enter change system-parameters duplication, <strong>and</strong> change the Enable<br />

Operation of PNC Duplication field to n.<br />

Issue 5 May 2009 127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!