PN Cold Restart Test (#955)<br />

This <strong>test</strong> runs on DS1C-BD (DS1 Converter Circuit Pack) <strong>and</strong> DS1-FAC (DS1 Facility).<br />

Table 465: Failure Audit Test (#949)<br />

Error<br />

Code<br />

2000<br />

2100<br />

2300<br />

2301<br />

Test<br />

Result<br />

Description / Recommendation<br />

ABORT Test timed out while waiting for a response from the circuit pack.<br />

Could not allocate the necessary system resources to run this <strong>test</strong>.<br />

The downlink message necessary to run this <strong>test</strong> could not be sent.<br />

The timer could not be set for the downlink message.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

2316 ABORT Fiber link is not administered.<br />

1. Enter add fiber-link to administer the DS1 converter fiber<br />

link.<br />

2500 ABORT Internal system <strong>error</strong><br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

0 NO<br />

BOARD<br />

FAIL The DS1 converter circuit pack reported failures or retransmitted a<br />

cleared failure message.<br />

1. Enter display <strong>error</strong>s <strong>and</strong> follow the repair procedures for any<br />

DS1C-BD (DS1 Converter Circuit Pack) <strong>and</strong> DS1-FAC (DS1<br />

Facility) <strong>error</strong>s.<br />

PASS The DS1 converter circuit pack has no failures.<br />

PN Cold Restart Test (#955)<br />

See NO BOARD for repair procedures.<br />

PN Cold Restart, or PN Reset Level 2, is used as an <strong>error</strong> recovery mechanism for a PN that<br />

has been taken out of service. Once a PN has gone out of service, a PN Cold Restart is<br />

required to bring it back into service.<br />

When a PN is taken out of service, all originating <strong>and</strong> terminating calls on the affected PN are<br />

dropped <strong>and</strong> new phone calls cot be made. During the restart, all hardware on the affected PN<br />

will be re-initialized. The restart takes no longer than 2 minutes.<br />

When the link has been down for 60 seconds, the PN is taken out of service. When the link<br />

comes up, a PN cold restart will occur automatically. See PN Warm Restart Test (#956).<br />

Issue 5 May 2009 1543