19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PKT-INT (Packet Interface)<br />

If a down-stream data packet is for a link that has already migrated over to the st<strong>and</strong>by<br />

PKT-INT, the peer link forwards the down-stream data packet to the st<strong>and</strong>by PKT-INT, <strong>and</strong> the<br />

st<strong>and</strong>by PKT-INT processes it <strong>and</strong> sends it out. Up-stream messages during migration are<br />

h<strong>and</strong>led by both PKT-INTs as with the down-stream messages. The PKT-INT that controls the<br />

link (the active PKT-INT if the link has not yet been migrated, <strong>and</strong> the st<strong>and</strong>by PKT-INT if the<br />

link has been migrated) processes the up-stream data packet <strong>and</strong> sends it up to the PCD.<br />

During the migration process, both the active <strong>and</strong> the st<strong>and</strong>by PKT-INTs can send up-stream<br />

messages to the PCD.<br />

On S8700, all down-stream packets go to the active PKT-INT, but the up-stream packets can<br />

come from the active <strong>and</strong> the st<strong>and</strong>by PKT-INTs during the migration process.<br />

● Link migration is performed to prepare the st<strong>and</strong>by PKT-INT for a hot reset.<br />

● RNRs are not sent to the endpoints at the start of the link migration.<br />

● PCD tells the active <strong>and</strong> st<strong>and</strong>by PKT-INTs that a link migration is starting.<br />

● LAPD links are migrated from the active-mig PKT-INT to the st<strong>and</strong>by-mig PKT-INT in the<br />

order they appear in the internal list.<br />

● Active-mig PKT-INT continues to accept up-stream messages for the links that are not yet<br />

migrated. The st<strong>and</strong>by-mig PKT-INT starts accepting up-stream messages for the links<br />

that are migrated. Both the active-mig <strong>and</strong> the st<strong>and</strong>by-mig PKT-INTs send up-stream<br />

messages to the PCD.<br />

● PCD accepts up-stream messages from both the active-mig <strong>and</strong> st<strong>and</strong>by-mig PKT-INTs.<br />

● PCD sends every down-stream message to the active-mig PKT-INT <strong>and</strong> has the<br />

active-mig PKT-INT send it out for those links that have not been migrated or forward it to<br />

the st<strong>and</strong>by-mig PKT-INT for those links that have been migrated.<br />

● At the end of the migration, the active-mig PKT-INT tells the PCD that the migration is<br />

finished, <strong>and</strong> PCD tells the st<strong>and</strong>by-mig PKT-INT to go active (hot interrupt). Some<br />

coordination verifies that every up- <strong>and</strong> down-stream message has been flushed from the<br />

active-mig PKT-INT before completing the interchange.<br />

PKT-INT <strong>and</strong> System Reliability<br />

S8700-series IP-PNC<br />

A PKT-INT module resides on each IPSI board. On an S8700 IP-PNC system, there is a<br />

duplicated server. One server is in active mode <strong>and</strong> one server is on st<strong>and</strong>by. The control<br />

network(s) may be implemented in a simplex, see Figure 56: IP-PNC Duplex Reliability -<br />

Simplex Control Network, or a optional duplicated configuration. There is only one PKT-INT per<br />

port network.<br />

Issue 5 May 2009 727

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!