19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INADS (INADS Link)<br />

MO Name in Log Alarm Level Initial Comm<strong>and</strong> to Run Full Name of MO<br />

INADS none <strong>test</strong> inads-link INADS Link<br />

INADS (INADS Link)<br />

The INADS Link MO represents the software <strong>and</strong> communications link used by the switch to call<br />

an alarm receiver. The purpose of the INADS Link MO is to:<br />

● Check the communications link between the system <strong>and</strong> the alarm receiver<br />

● Verify that the alarm notification process works correctly<br />

To verify that alarms will be reported to the alarm receiver, either a centralized technician can<br />

remotely <strong>test</strong> the process, or an on-site technician can <strong>test</strong> the connection either during an<br />

installation or a subsequent service call.<br />

Although the INADS Link MO never alarms, its <strong>error</strong>s are logged, <strong>and</strong> these <strong>error</strong>s are only<br />

logged by entering <strong>test</strong> inads-link.<br />

<strong>Dem<strong>and</strong></strong> <strong>test</strong> <strong>descriptions</strong> <strong>and</strong> <strong>error</strong> <strong>codes</strong><br />

The <strong>test</strong> inads-link comm<strong>and</strong> is different from other <strong>test</strong> comm<strong>and</strong>s:<br />

● There is no long or short option.<br />

● Resulting <strong>test</strong> does not have an associated <strong>test</strong> number.<br />

When a user enters <strong>test</strong> inads-link, the system immediately returns either the Comm<strong>and</strong><br />

successfully completed or Comm<strong>and</strong> failed message.<br />

INADS Link Test (No Test Number)<br />

The INADS Link <strong>test</strong> attempts to call an alarm receiver (in the background) to verify the<br />

communications link with the alarm receiver. When a user enters <strong>test</strong> inads-link, the<br />

system immediately returns either a Comm<strong>and</strong> successfully completed or Comm<strong>and</strong><br />

failed message.<br />

The “Comm<strong>and</strong> successfully completed” message means the switch will attempt to call the<br />

alarm receiver in 2 minutes. (This <strong>test</strong> runs even if Alarm Origination is disabled.) The 2-minute<br />

delay provides enough time for a remote technician to hang up the call <strong>and</strong> thus free up the<br />

alarm receiver’s line so that the customer’s switch can call the alarm receiver back. The<br />

“Comm<strong>and</strong> failed” message appears when either:<br />

● A previously entered <strong>test</strong> inads-link is in progress<br />

● The system is attempting to report active alarms to the alarm receiver<br />

Issue 5 May 2009 507

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!