19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This <strong>test</strong> runs on TBRI-PT (ISDN Trunk-Side BRI Port).<br />

Table 492: BRI Layer 3 Query Test (#1243)<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

BRI Layer 3 Query Test (#1243)<br />

1005 ABORT Wrong configuration. This <strong>test</strong> may not be applicable, or it may be<br />

disruptive to terminal equipment other than a voice terminal (for example,<br />

a modem pool member or Music on Hold). This <strong>error</strong> can be ignored.<br />

1019 ABORT Test is already running.<br />

1113 ABORT The signaling link is down.<br />

FAIL<br />

1. Enter <strong>test</strong> port location long to clear any <strong>error</strong>s which<br />

prevent establishment of the signaling link.<br />

2. Examine the results of Test #626, which is executed with the<br />

<strong>test</strong> port comm<strong>and</strong>. If this <strong>test</strong> aborts or fails, follow the repair<br />

procedure for the Signaling Link Status Test (#626).<br />

3. Escalate the problem if BRI Layer 3 Query <strong>test</strong> continues to abort.<br />

1187 ABORT The circuit pack or port may have been busied out by a technician.<br />

1. Look in the Error Log for Error Type 18 (busied out) for TBRI-BD,<br />

MG-BRI or TBRI-PT.<br />

a. If this Error Type is present for TBRI-PT, enter release port<br />

location <strong>and</strong> run the <strong>test</strong> again.<br />

b. If the <strong>error</strong> is present for both TBRI-BD <strong>and</strong> TBRI-PT or MG-BRI<br />

<strong>and</strong> TBRI-PT, enter release board location <strong>and</strong> run the<br />

<strong>test</strong> again. When you release the circuit pack, you release every<br />

port associated with it. If certain ports still need to be busied out,<br />

use<br />

busyout port location to busy them out.<br />

2. Make sure the terminal is connected.<br />

3. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2012 ABORT Internal system <strong>error</strong>.<br />

2100<br />

Could not allocate the necessary system resources to run this <strong>test</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

PASS A Status Inquiry message was successfully sent. Use display <strong>error</strong>s<br />

for the board to determine the true results of the <strong>test</strong>.<br />

Issue 5 May 2009 1603

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!