19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

OLS Recycle Test (#126)<br />

The Off-Line Switcher (OLS) Recycle Test <strong>test</strong> is destructive.<br />

This <strong>test</strong> removes power from the specified carrier <strong>and</strong> causes all circuit packs in the recycled<br />

carrier to be removed <strong>and</strong> inserted. These actions cause all calls originating from or terminating<br />

to circuit packs in this carrier to be dropped. The pair of OLSs in the specified carrier is recycled.<br />

Both OLSs in the carrier are turned off for 2 seconds <strong>and</strong> then back on again. After the OLSs<br />

have been turned back on, the <strong>test</strong> queries a PN’s Maintenance circuit pack for the status of the<br />

pair of OLSs in the specified carrier. If both OLSs are on <strong>and</strong> functioning, then the <strong>test</strong> passes. If<br />

both OLSs are not on <strong>and</strong> functioning, the <strong>test</strong> fails, <strong>and</strong> BOTH OLSs are turned off.<br />

This <strong>test</strong> is run on CARR-POW (Carrier Power Supply).<br />

Table 333: OLS Recycle Test (#126) 1 of 2<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1000 ABORT System resources required for this <strong>test</strong> are not available.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

1366 ABORT The active Tone-Clock for the PN is in requested carrier.<br />

1. If duplicated Tone-Clock boards or IPSIs exist, enter<br />

set tone-clock to switch Tone-Clocks, otherwise the power cot<br />

be cycled.<br />

2. If the tone-clock switch succeeds, rerun the <strong>test</strong>.<br />

1367 ABORT The active Expansion Interface link for the PN is in requested carrier.<br />

1. If duplicated EIs exist, enter reset pnc interchange to switch<br />

EIs. Otherwise, the power cot be cycled.<br />

2. If the reset succeeds, rerun the <strong>test</strong>.<br />

1368 ABORT Processor carrier - the carrier cot be recycled.<br />

1. The "A" carrier is not allowed to be recycled.<br />

1424 ABORT Switch node carrier - the carrier cot be recycled.<br />

1. Switch node carriers are not allowed to be recycled.<br />

2000 ABORT Response from the <strong>test</strong> was not received within the time allowed.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

1224 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!