19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DS1-BD (DS1 Interface Circuit Pack)<br />

j. Error Type 1301: CSU module/T1 sync splitter not expected. The 120A CSU or T1 sync<br />

splitter is physically connected to the TN767E board on the back of the port carrier, but the<br />

Near-End CSU Type field on the add ds1 screen has not been administered as<br />

integrated.<br />

If the 120A CSU or T1 sync splitter is to be used, use change ds1 to change the<br />

Near-End CSU Type field to integrated. Otherwise, physically remove the 120A CSU<br />

or T1 sync splitter from the back of the port carrier.<br />

k. Error Type 1302: DS1 configuration <strong>error</strong>. Attempting to use a 120A CSU with a TN767E<br />

circuit pack that is configured for 32-chel (2.048-Mbps) operation. This CSU only works with<br />

a DS1 board configured for 24-chel (1.544-Mbps) operation in the United States of America.<br />

l. Error Type 1303: DS1 circuit pack suffix incorrect for CSU or T1 sync splitter. The<br />

Near-End CSU Type field on the add ds1 screen has been administered as<br />

integrated but the DS1 circuit pack is not a TN767E (or higher-suffixed) DS1 board.<br />

If the 120A CSU or T1 sync splitter is to be used, remove the circuit pack <strong>and</strong> replace it<br />

with a TN767E (or higher-suffixed) board. Otherwise, use change ds1 to change the<br />

Near-End CSU Type field to other.<br />

m. Error Type 1310: BLB failure. This <strong>error</strong> occurs when the DS1 Board Loopback (BLB)<br />

dem<strong>and</strong> <strong>test</strong> fails. Repeat the <strong>test</strong> using busyout board location, <strong>test</strong> ds1-loop<br />

location ds1/csu-loopback-<strong>test</strong>s, release board location. If the BLB <strong>test</strong><br />

continues to fail, then the TN767E circuit pack needs to be replaced.<br />

n. Error Type 1311: ELB failure. This <strong>error</strong> occurs when the Integrated CSU (I-CSU) Module<br />

Equipment Loopback (ELB) <strong>test</strong> fails. This <strong>test</strong> is executed during I-CSU/T1 sync splitter<br />

power-up/reset (i.e., the TN767E board is physically inserted <strong>and</strong> the CSU module/T1 sync<br />

splitter is already installed) or when the CSU module/T1 sync splitter is plugged on to an<br />

already initialized DS1 board. The ELB <strong>test</strong> is also executed as part of <strong>test</strong> ds1-loop<br />

location ds1/csu-loopback-<strong>test</strong>s.<br />

Attempt to clear the alarm with busyout board location, <strong>test</strong> ds1-loop<br />

location ds1/csu-loopback-<strong>test</strong>s, <strong>and</strong> release board location. If the ELB<br />

<strong>test</strong> continues to fail, then either the TN767E board, the CSU module, the T1 sync splitter,<br />

or the I/O cable between the backplane <strong>and</strong> the CSU module/T1 sync splitter (or any<br />

combination thereof) has failed. Escalate this problem.<br />

o. Error Type 1312: RLB failure. This <strong>error</strong> occurs when the Integrated CSU (I-CSU) Module<br />

Repeater Loopback (RLB) <strong>test</strong> fails. This <strong>test</strong> is executed during I-CSU/T1 sync splitter<br />

power-up/reset (i.e., the TN767E board is physically inserted <strong>and</strong> the CSU module/T1 sync<br />

splitter is already installed) or when the CSU module/T1 sync splitter is plugged on to an<br />

already initialized DS1 board. The RLB <strong>test</strong> is also executed as part of the comm<strong>and</strong> <strong>test</strong><br />

ds1-loop location ds1/csu-loopback-<strong>test</strong>s.<br />

Attempt to clear the alarm with busyout board location, <strong>test</strong> ds1-loop<br />

location ds1/csu-loopback-<strong>test</strong>s, <strong>and</strong> release board location. If the RLB<br />

<strong>test</strong> continues to fail, then the CSU module/T1 sync splitter needs to be replaced.<br />

Issue 5 May 2009 351

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!