19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

Table 451: Far-End Lightwave Transceiver Loopback Test #789 2 of 3<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

2300 ABORT The downlink message necessary to run this <strong>test</strong> could not be sent.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

2301 ABORT The timer could not be set before sending the downlink message.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

2316 ABORT Fiber link is not administered.<br />

1. Administer the DS1 converter fiber link using add fiber-link.<br />

2321 ABORT DS1 converter circuit pack is not busied out.<br />

1. Busyout the DS1 converter circuit pack with busyout board.<br />

2332 ABORT With this system configuration (unduplicated PNC), the <strong>test</strong> cot run at the<br />

far end when there is only one DS1-FAC available. The link would be lost,<br />

<strong>and</strong> no <strong>test</strong> results would be seen at the server. Run the <strong>test</strong> at the other<br />

end of the DS1C complex.<br />

2500 ABORT Internal system <strong>error</strong><br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 3 times.<br />

1506 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

2 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!