Table 413: BRI Port Local LAN Looparound Test (#618) 2 of 2<br />

Error<br />

Code<br />

2012<br />

2100<br />

Test<br />

Result<br />

BRI Port Local TDM Looparound Test (#619)<br />

BRI Port Local TDM Looparound Test (#619)<br />

ABORT Internal system <strong>error</strong><br />

Could not allocate the necessary system resources to run this <strong>test</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

FAIL The looparound <strong>test</strong> has failed.<br />

1. If the <strong>test</strong> fails repeatedly, attempt to reset the circuit pack if the<br />

other ports on the board are idle.<br />

2. Rerun the <strong>test</strong>. If the <strong>test</strong> fails again, enter <strong>test</strong> pkt pn#. If this<br />

fails, follow the failure procedures in PKT-BUS (Packet Bus).<br />

3. If the <strong>test</strong>s executed in step 2 pass, the problem is local to the BRI<br />

board. Replace the circuit pack.<br />

PASS The BRI Port Local LAN Looparound <strong>test</strong> has passed.<br />

1. Enter release board location to put the board <strong>and</strong> ports back<br />

into service.<br />

This <strong>test</strong> is destructive.<br />

This <strong>test</strong> verifies the connectivity of a BRI port across the TDM Bus. It aborts if calls associated<br />

with the port are in progress. Failure of this <strong>test</strong> indicates an on-board fault associated with the<br />

port hardware on the circuit pack.<br />

This looparound <strong>test</strong> runs the following individual <strong>test</strong>s on the two B-Chels (B1 <strong>and</strong> B2)<br />

associated with the port:<br />

● Looparound <strong>test</strong> across the TDM Bus for B1.<br />

● Conference Circuit <strong>test</strong> for B1.<br />

Description / Recommendation<br />

● Looparound <strong>test</strong> across the TDM Bus for B2.<br />

2 of 2<br />

● Conference Circuit <strong>test</strong> for B2.<br />

The <strong>test</strong>s are run in the above order. If one <strong>test</strong> fails, the remaining <strong>test</strong>s in the sequence are not<br />

executed <strong>and</strong> an <strong>error</strong> code is returned at that point.<br />

This <strong>test</strong> runs on BRI-PORT (ISDN-BRI Port) <strong>and</strong> TBRI-PT (ISDN Trunk-Side BRI Port).<br />

Issue 5 May 2009 1399