19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

Table 393: Expansion Interface Control Chel Test (#316) 2 of 2<br />

Error<br />

Code<br />

Test<br />

Result<br />

PASS The circuit pack responded correctly to the <strong>test</strong>. Communication from<br />

software to the ATM-EI or EI circuit pack is functioning.<br />

1. Refer to other ATM-EI or EI circuit pack <strong>test</strong>s if the link is not<br />

functioning correctly.<br />

0 NO<br />

BOARD<br />

Description / Recommendation<br />

See NO BOARD for the repair procedures.<br />

Expansion Interface Reset Test (#336)<br />

This <strong>test</strong> is destructive.<br />

The Expansion Interface Reset <strong>test</strong> is executed using reset board location, where<br />

location is the location of the EI circuit pack to be reset. This <strong>test</strong> is potentially very<br />

destructive <strong>and</strong> requires the EI circuit pack to be busied out prior to execution of this <strong>test</strong>.<br />

If the system does not have duplicated PNC, <strong>and</strong> is a Direct Connect system, <strong>and</strong> one of the EI<br />

circuit packs must be reset, the action of busying out the desired EI circuit pack will deny calls to<br />

the PN until the EI circuit pack is released from the busyout state. If the EI circuit pack is part of<br />

a PN-to-PN link, new connections to the PN will be denied. If the EI circuit pack is part of a<br />

PN-to-PN link, calls between the two PNs will be denied.<br />

In a non-duplicated PNC system with a Center Stage Switch, if the EI circuit pack in the PN is<br />

busied out, new service to that PN only will be denied. However, if the EI circuit pack resides in<br />

the PN, new service to every PN will be denied until the EI circuit pack is released from the<br />

busyout state.<br />

If the system does not have duplicated PNC, the reset of any EI is allowed, but it will result in<br />

the resetting of every PN board <strong>and</strong> loss of service to the PN(s) for a few minutes.<br />

If the system does have duplicated PNC, <strong>and</strong> the EI circuit pack to be reset is part of the active<br />

PNC, the system will not allow the busyout <strong>and</strong> the system technician will be required to<br />

interchange the PNCs using reset pnc interchange. After executing the PNC interchange,<br />

it will be possible to busyout <strong>and</strong> then reset the original EI circuit pack.<br />

If the PN’s Maintenance (MAINT) circuit pack determines that the EI (EXP-INTF) circuit pack is<br />

cycling between sane <strong>and</strong> insane several times within several minutes, MAINT may inhibit<br />

operation of the EXP-INTF by holding the EI circuit pack in a reset state. This condition may<br />

result in an unsuccessful reset of the EI circuit pack.<br />

1358 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!