This procedure is destructive.<br />

1. Use busyout ds1-facility to busy out the DS1 facility.<br />

2. Replace the DS1 facility.<br />

3. Use release ds1-facility to release the DS1 facility.<br />

For a critical-reliability system (PNC duplication):<br />

This procedure is nondestructive.<br />

1. If the DS1 facility to be replaced is on the active PNC (its amber LED is on solid), use<br />

reset pnc interchange to do a PNC dem<strong>and</strong> interchange. Use status pnc to<br />

determine the active PNC.<br />

2. When the DS1 facility to be replaced is on the st<strong>and</strong>by PNC (if the DS1 facility was<br />

originally on the st<strong>and</strong>by PNC or after the PNC interchange has finished), use busyout<br />

ds1-facility to busyout the DS1 facility.<br />

3. Replace the DS1 facility.<br />

4. Use release ds1-facility to release the DS1 facility.<br />

Installing a DS1 Facility<br />

To install a DS1 facility:<br />

1. Connect the facility.<br />

2. Use list fiber-link to check the fiber link number.<br />

3. Use change fiber-link to administer the DS1 facility via the comm<strong>and</strong>. Set the<br />

Facility Installed field to y for the facility that is being installed.<br />

4. Use busyout board to busyout the DS1 converter circuit pack.<br />

5. Use <strong>test</strong> board location long to run the DS1 Facilities Connectivity Test (#790), to<br />

ensure that the facilities are connected correctly.<br />

6. Use release board to release the DS1 converter circuit pack.<br />

Removing a DS1 Facility<br />

Removing a DS1 facility is service disrupting in any system configuration, because the DS1<br />

facility administration is similar on both sides of the PNC on critical-reliability systems.<br />

This procedure is destructive.<br />

1. Use busyout ds1-facility to busyout the DS1 facility.<br />

2. Use list fiber-link to check the fiber link number.<br />

3. Use change fiber-link to administer the DS1 facility. Set the Facility Installed<br />

field to n for the facility that is being removed.<br />

4. Disconnect the DS1 facility (or facilities in a critical-reliability system configuration).<br />

358 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers