19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Automatic Download Actions<br />

This section describes download actions that occur automatically.<br />

System Reboot/Restart<br />

DIG-LINE (Digital Line)<br />

A global download action is started when periodic maintenance <strong>test</strong>s start after a system<br />

reboot/restart regardless of whether the parameters have been downloaded previously.<br />

Periodic Tests<br />

Note: It<br />

If the download flag is still set when periodic <strong>test</strong>s are run on a terminal, a download action<br />

will occur. This operation is required in case a terminal could not be downloaded<br />

previously either:<br />

● Because it was off-hook at the time the system first booted<br />

● Because the terminal was off-hook at the time translation associated with<br />

downloadable parameters was changed<br />

Note:<br />

may take more than 1 hour for periodic <strong>test</strong>s to reach the terminal that needs to<br />

be downloaded.<br />

Terminal Administration<br />

A downloadable terminal is automatically downloaded when translation changes<br />

associated with downloadable parameters are made as part of system administration. As<br />

shown in Table 85: Parameters Downloadable to Programmable Terminals, these<br />

changes can be for a specified terminal or may be system-wide. If the change is for<br />

system-level parameter, a background global update request is made to download all<br />

programmable terminals.<br />

This global update may take more than an hour for a system with several thous<strong>and</strong><br />

programmable terminals.<br />

Port Insertion<br />

Whenever maintenance software initiates a request to place a port into service, a terminal<br />

download action is started on that terminal if that terminal is programmable. This port<br />

insertion action occurs under the following circumstances:<br />

● A digital line circuit pack or media module that is physically inserted into the system<br />

has ports currently administered for programmable terminals.<br />

If more than 20 port insertion requests are received within a few seconds, a global<br />

download request is started up as a background task. This action updates all<br />

programmable terminals instead of just those being inserted. This is done to avoid<br />

system overload for situations where there is massive board insertion. This could<br />

occur when connectivity to an PN is re-established after that PN was down.<br />

● A station port is added to the system by add station or change station.<br />

● A TTI port is activated.<br />

Issue 5 May 2009 323

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!