High-Reliability System (Duplicated Server<br />

<strong>and</strong> SNCs, Unduplicated PNC)<br />

This procedure is nondestructive.<br />

1. If the SNC circuit pack to be replaced is the active SNC in the switch node carrier (yellow<br />

LED is on solid), use set switch-node-clock to set the st<strong>and</strong>by SNC to active.<br />

2. When the SNC circuit pack is in st<strong>and</strong>by mode (yellow LED is off), pull out the SNC circuit<br />

pack to be replaced.<br />

3. Insert a new SNC circuit pack.<br />

4. Wait for the SNC to reset. (The red <strong>and</strong> green LEDs light <strong>and</strong> then go out.) The yellow LED<br />

should be off because the SNC circuit pack is in st<strong>and</strong>by mode.<br />

Critical-Reliability System (Duplicated Server <strong>and</strong> PNC)<br />

WARNING: On a system with duplicated PNC, synchronization may be provided over a<br />

combination of active <strong>and</strong> st<strong>and</strong>by components. This condition is indicated by an<br />

OFF-BOARD WRN alarm against TDM-CLK with Error Type 2305. Repairs to<br />

st<strong>and</strong>by PNC in this state may disrupt service. Otherwise, if the active PNC is<br />

functional, replacement of a st<strong>and</strong>by component will not disrupt service.<br />

To replace an SNC circuit pack in a critical-reliability system:<br />

1. Enter status pnc.<br />

Verify that the component to be replaced is on the st<strong>and</strong>by PNC.<br />

2. Enter busyout pnc.<br />

3. Enter busyout board location.<br />

4. Replace the circuit pack.<br />

5. Enter release board location.<br />

CAUTION: Do<br />

! CAUTION:<br />

not busyout any Expansion Interface circuit pack after this point.<br />

6. Enter <strong>test</strong> alarms long clear for category exp-intf.<br />

7. Wait 5 minutes for SNI-BD, SNI-PEER, FIBER-LK, <strong>and</strong> DS1C alarms to clear, or enter<br />

clear firmware-counters a-pnc | b-pnc. Use the letter designation of the PNC<br />

that holds the replaced component (the st<strong>and</strong>by PNC).<br />

8. Enter status pnc.<br />

If either PNC’s state of health is not “functional”, consult PNC-DUP (PNC Duplication).<br />

9. Enter release pnc.<br />

850 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers