19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance <strong>Dem<strong>and</strong></strong> Tests<br />

OLS/Power Unit Query Test (#127)<br />

This <strong>test</strong> is known as the Off-Line Switcher (OLS) Query Test for the following maintenance<br />

objects:<br />

● CABINET (Cabinet Sensors)<br />

● CARR-POW (Carrier Power Supply)<br />

● RING-GEN (Analog Ring Generator)<br />

This <strong>test</strong> is known as the Power Unit Query Test for:<br />

● AC-POWER<br />

● CABINET (Cabinet Sensors)<br />

● EMG-XFER (Emergency Transfer)<br />

● POWER<br />

This <strong>test</strong> queries the PN’s Maintenance for the status of the pair of OLSs in the specified carrier.<br />

If both OLSs are on <strong>and</strong> functioning, then the <strong>test</strong> passes. If both are not on <strong>and</strong> functioning, it<br />

fails.<br />

Table 334: OLS/Power Unit Query Test (#127) 1 of 5<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

1000 ABORT System resources required for this <strong>test</strong> are not available.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2000 ABORT Response from the <strong>test</strong> was not received within the time allowed.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2. If the <strong>test</strong> continues to ABORT with <strong>error</strong> code 2000, check for<br />

system powering problems with the PN’s A carrier. Resolve every<br />

AC-POWER <strong>and</strong> CARR-POW alarm in a multicarrier-cabinet system<br />

or DC-POWER alarm in a single-carrier cabinet system. Then,<br />

repeat the <strong>test</strong>.<br />

3. If the <strong>test</strong> continues to ABORT with a 2000 <strong>error</strong> code, resolve any<br />

<strong>error</strong>s against the PN’s MAINT (Maintenance circuit pack). Then,<br />

repeat the <strong>test</strong>.<br />

2029<br />

2500<br />

ABORT Internal system <strong>error</strong><br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

1226 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

1 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!