19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 483: CSU Equipment Loopback Test (#1210) 2 of 3<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

CSU Equipment Loopback Test (#1210)<br />

1015 ABORT Ports on the DS1 Interface circuit pack have not been busied out.<br />

1. Enter busyout board location to put all trunks or ports of the<br />

DS1 Interface circuit pack into the out-of-service state.<br />

2. Retry the comm<strong>and</strong>.<br />

1039 ABORT The DS1 Interface circuit pack is providing timing for the system.<br />

Executing this <strong>test</strong> could cause major system disruption.<br />

If the DS1 Interface circuit pack needs to be <strong>test</strong>ed, set the<br />

synchronization reference to another DS1 Interface circuit pack or to the<br />

Tone-Clock circuit with the following comm<strong>and</strong> sequence:<br />

1. disable synchronization-switch.<br />

2. set synchronization location.<br />

3. enable synchronization-switch.<br />

1412 ABORT This <strong>test</strong> does not run on media modules or media gateways. Ignore.<br />

1950 ABORT Another loopback/span <strong>test</strong> is already executing on the DS1 board or the<br />

board is in a network requested loopback mode (Line loopback or<br />

Payload loopback). The <strong>error</strong> log will indicate whether a Customer<br />

loopback jack <strong>test</strong>, Far CSU Loopback <strong>test</strong>, or the One-Way Span <strong>test</strong> is<br />

executing or if the board is in line loopback or payload loopback mode.<br />

Only one long-duration loopback/span <strong>test</strong> can be active at a given time.<br />

If a loopback/span <strong>test</strong> is already active, that <strong>test</strong> must be deactivated via<br />

<strong>test</strong> ds1-loop location end-loopback/span-<strong>test</strong> in order to<br />

run this <strong>test</strong>.<br />

1951 ABORT The CSU Equipment Loopback <strong>test</strong> could not be executed because the<br />

120A CSU module/T1 sync splitter was not physically installed. Physically<br />

connect the 120A CSU module/T1 sync splitter to the DS1 board on the<br />

back of the port carrier.<br />

2000 ABORT Response to the <strong>test</strong> was not received within the allowed time.<br />

1. Check for board hyperactivity. See Hyperactive DS1/UDS1<br />

Interface Circuit Pack/Media Module.<br />

2100 ABORT Could not allocate the necessary system resources to run this <strong>test</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2 of 3<br />

Issue 5 May 2009 1581

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!