19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A problem with the ISDN-PLK will affect every associated B-Chel since no call control<br />

information can be conveyed to the far-end switch or terminal adapter. Stable calls may remain<br />

operational, but no new calls can be placed. In turn, the ISDN-PLK depends on:<br />

● For systems supporting circuit packs:<br />

● the UDS1 Interface circuit pack where it resides<br />

● the packet bus that provides the link to the processor<br />

● For systems supporting media modules:<br />

● the DS1 Interface Media Module that provides the link to the processor<br />

If there are problems with the ISDN-PLK, also investigate UDS1-BD (UDS1 Interface Circuit<br />

Pack) <strong>and</strong> PKT-BUS (Packet Bus) for systems supporting circuit packs, or investigate MG-DS1<br />

(DS1 Interface Media Module) for systems supporting media gateways.<br />

Error log entries <strong>and</strong> recommended actions<br />

Table 155: ISDN-PLK Error Log Entries<br />

Error<br />

Type<br />

Aux<br />

Data<br />

Associated Test Alarm<br />

Level<br />

On/Off<br />

Board<br />

Recommended Action<br />

0 (a) 0 Any Any Any <strong>test</strong> port location 1<br />

18 (b) 0 busyout port<br />

location 1<br />

1. location is 24 for 24-chel interfaces <strong>and</strong> 16 for 32-chel interfaces.<br />

WRN OFF release port location 1<br />

130 (c) WRN ON <strong>test</strong> port location 1<br />

1537 (d) 46210 WRN OFF<br />

1793 (e) <strong>test</strong> board location l<br />

3585 (f) 46222 MIN ON<br />

3841 (g) 46211<br />

3842 (h) 46223<br />

3843 (i) Signaling Port LAN<br />

Loopback (#939)<br />

Notes:<br />

a. Error Type 0: run the short <strong>test</strong> sequence first. If every <strong>test</strong> passes, run the long <strong>test</strong><br />

sequence. Refer to each appropriate <strong>test</strong>’s description, <strong>and</strong> follow its recommended<br />

procedures.<br />

546 Maintenance Alarms for Communication Manager, Media Gateways <strong>and</strong> Servers<br />

<strong>test</strong> port location 1 l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!