19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 371: MTP SAT Chel Local Looparound Test (#228)<br />

Error<br />

Code<br />

Test<br />

Result<br />

Description / Recommendation<br />

Serial Chel Local Looparound Test (#229)<br />

Serial Chel Local Looparound Test (#229)<br />

1000 ABORT System resources required for this <strong>test</strong> are not available.<br />

2000 Response to the <strong>test</strong> was not received within the allowed time.<br />

2033 Internal system <strong>error</strong>.<br />

1. Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

2034 ABORT The SAT port is busy. Background maintenance may be running.<br />

1. .Retry the comm<strong>and</strong> at 1-minute intervals up to 5 times.<br />

FAIL The PN terminal is not usable.<br />

1. Run the <strong>test</strong> three more times.<br />

2. If the <strong>test</strong> continues to fail, replace the PN’s Maintenance circuit<br />

pack.<br />

PASS The serial interface circuitry on the PN’s Maintenance circuit pack which<br />

controls the PN-connected terminal is functioning properly. If there are<br />

still troubles with the PN G3-MT terminal, the problem may be one of<br />

the following:<br />

1. The PN-connected terminal is not configured properly. The<br />

connection between the terminal <strong>and</strong> the PN’s Maintenance circuit<br />

pack must be set up at 9600 bps.<br />

2. The serial link from the back of carrier A to the PN terminal may be<br />

defective. The serial link consists of the connector on the back of<br />

carrier A labeled TERM <strong>and</strong> the ribbon cable running to the<br />

terminal.<br />

3. The terminal may be defective. Try another terminal.<br />

4. Since this <strong>test</strong> is not 100 percent accurate, there may still be<br />

problems with the PN’s Maintenance circuit pack.<br />

This <strong>test</strong> checks TN775D on-board circuitry associated with the serial links to the Expansion<br />

Interface circuit packs.<br />

Issue 5 May 2009 1305

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!