19.12.2012 Views

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

Demand test descriptions and error codes - Avaya Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PNC-DUP (PNC Duplication)<br />

Most repairs involve fixing a single fault on the st<strong>and</strong>by PNC.<br />

1. Use set pnc lock or busyout pnc to prevent an interchange into the PNC being<br />

repaired.<br />

If a faulty component exists on the currently active PNC, the st<strong>and</strong>by PNC is more<br />

severely faulted. Normally the st<strong>and</strong>by PNC is repaired first because it is the most severely<br />

impaired.<br />

2. To repair the active PNC, use reset pnc interchange override-<strong>and</strong>-lock to<br />

request an interchange <strong>and</strong> ensure that no subsequent interchange occurs during the<br />

repair of the st<strong>and</strong>by PNC.<br />

The dem<strong>and</strong> interchange may not be necessary if the following conditions drive a<br />

spontaneous interchange:<br />

● The anti-thrashing period from the last interchange has expired.<br />

● The global refresh from releasing the st<strong>and</strong>by PNC has completed.<br />

The st<strong>and</strong>by PNC SOH is better than the active.<br />

3. At this point, the faulty component is on the st<strong>and</strong>by PNC, <strong>and</strong> the PNCs are locked in their<br />

current active/st<strong>and</strong>by state. Busy-out the PNC.<br />

4. Use fault isolation <strong>and</strong> component <strong>test</strong>ing procedures for the individual PNC components.<br />

Replacement of components will not disrupt operation of the active PNC.<br />

5. Once the failed component is replaced, <strong>test</strong> the st<strong>and</strong>by PNC component from the terminal<br />

to ensure the replacement is functioning properly.<br />

6. When the problem is resolved as indicated by a state of health with all zeros, (status<br />

pnc), unlock <strong>and</strong> release the pnc.<br />

No further PNC interchange is required because you can <strong>test</strong> the st<strong>and</strong>by PNC as thoroughly as<br />

the active.<br />

Interactions: Server Resets <strong>and</strong> PNC Interchanges<br />

● A system reset of level 1 (warm), 2 (cold2) or 4 (reboot) does not change which PNC is<br />

active. If a PNC interchange was in progress when the reset took place, the PNC<br />

interchange still goes to completion.<br />

● If a system reset level 1 (warm) takes place during a PNC interchange, the reset is<br />

escalated to level 2 (cold2).<br />

Issue 5 May 2009 765

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!